NCF参数化建筑论坛

标题: Waterloo International Railway Station [打印本页]

作者: starchitect    时间: 2010-10-20 12:12
标题: Waterloo International Railway Station
Waterloo International Railway Station by Nicholas Grimshaw and Partners. Completed in 1994, the project design had to negotiate complex site constraints that were constantly being changed throughout the design process. Due to the variable site width, every change in the site constraints had an effect on every truss member. Although parametric modeling was not used on this project, the difficult of the design lead 4 of its designers to later form the Smart Geometry Group, a non-profit organization devoted to the development and promotion of new computational design tools.
作者: wangwenhao0405    时间: 2010-10-20 16:53
学习~~有张图片没显示.
作者: scmast    时间: 2010-10-20 23:33
真的是支持!!
作者: penn    时间: 2010-10-21 10:47
高手啊,膜拜一下
作者: xyhoster    时间: 2010-10-21 12:15
膜拜加学习一下
作者: neiei    时间: 2011-4-9 13:39
谢谢楼主~~~~~~~
作者: waynebwy    时间: 2011-4-10 11:21
谢谢分享!!!
作者: 不懂    时间: 2011-4-23 12:34
谢谢分享!!!
作者: orange-TA    时间: 2011-8-18 13:10
谢谢分享..............
作者: tuwine    时间: 2011-8-19 15:06
還不錯 試試看! 學習
作者: ayan    时间: 2011-8-19 19:25
谢谢分享,学习看看
作者: asaika    时间: 2011-11-29 22:23
先弄来学学
作者: 丞丞    时间: 2012-2-1 09:17
谢谢楼主分享。。。。
作者: lixin99182    时间: 2012-2-1 16:39
谢谢啦。好的。
作者: LONECH    时间: 2012-3-4 14:23
蠕虫··~~~~~
作者: wzlcff    时间: 2012-5-24 13:16
膜拜一下……
作者: wzlcff    时间: 2012-6-4 20:42
学习一下……
作者: wzlcff    时间: 2012-6-11 17:13
学习一下……
作者: angel120317    时间: 2012-6-11 18:49
谢谢分享,学习看看




欢迎光临 NCF参数化建筑论坛 (http://ncf-china.com/) Powered by Discuz! X3.2